Category Archives: building work

November at St Mary’s

Just in case you haven’t already heard ….

St Mary’s Buckden
*800 and counting* Challenge
FINAL TOTAL: £10,000
THANK YOU to everyone for helping us. This is a fantastic boost for our Restoration Appeal

A quick update on the restoration.  Work on the tower stonework is ongoing.  The clock has been taken away for repair and there is additional work needed on the masonry that was behind the clock.
DSC00024 150PPI W Face P1020136  P1020118 (2)

Coming up in November (see newsletter or posters below for details)
Churchyard Tidy on Saturday 4th – bring your own tools!
All Souls service on Sunday 5th
Friends in Deed Café on Wednesday 8th
M&Ms Christmas Crafts & Flowers on Wednesday 8th
Come and meet Pudsey Bear on Thursday 9th – bring a teddy
Remembrance services on Saturday 11th and Sunday 12th
Open Meeting on 26th – come and share your thoughts

pudsey

In September-October we raised £1,500 for BLOODWISE

Our chosen Charity for November-December is DEC East Africa Crisis Appeal   www.dec.org.uk/appeal/east-africa-crisis-appeal Hunger on a massive scale is looming across East Africa. Drought and conflict have left 19 million people in urgent need of food, water and medical treatment. People are already dying in South Sudan and Somalia. In Kenya and Ethiopia, water shortages caused by drought are severe and likely to worsen. Women, children and older people are suffering the most; half a million children under five are at risk of dying from severe acute malnutrition and require immediate lifesaving treatment. Diseases such as cholera and measles are spreading fast, as more people flee fighting and are forced to live in poor overcrowded conditions. DEC member charities are responding to the crisis and delivering life-saving aid. But, they need more money to help reduce the scale and severity of the crisis.

Remembrance Day Service Poster

For more information about what’s on at St Mary’s, see our monthly Newsletter 1711 st marys newsletter NOV2017  or the poster below

1711 roundabout-events DRAFT_Page_1

 

Advertisements

Clock repairs

18th October 2017 and the clock faces have gone on their travels to be repaired.
Thanks you to everyone who has contributed to our Restoration Appeal, without your help these repairs would not be possible.

The two clock faces probably date back to about 1893. Here’s a brief history of the clock (provided by our historian B Jobling):-
1630, a clock is mentioned as being in the tower;
1652: 6s/6d was paid to John Martin & others for mending ye clock and ye bells.
1680, the present clock and chimes (and presumably a dial) were made and installed by Thomas Powers of Wellingborough.  Powers maintained the clock from 1680 to 1709; then Joseph Eayres of St. Neots maintained the clock etc, from 1732 to 1772.
1730:  The famous view of Buckden Palace & Church (reproduced on the inside cover of the Buckden Book) shows a single clock face on the south side of the tower one stage lower on the tower than at present (i.e. where the new bell frame is); indicating that the whole clock mechanism was likely also at that lower level.  The clock face is lozenge/diamond shape but possibly smaller than now.  The west side of the tower at that height has a medieval window at that height.  There is no clock face on the west side of the tower.,
1733: Joseph Eayres of St. Neots supplied a new clock dial (note: singular).
1733: “Paid Jon Allerson for bringing the clock & chimes from St Neots [probably after Eayres had repaired it at his workshops] & hired a man to drive his team 1/8d. Writing a bond for maintenance of clock & chimes 3/0d. Maintenance by Mr Eayres 15/0d per year”.
1773: a sketch of Buckden Church in the British Library shows no clock face on the west side of the tower.
1812: a sketch of the church shows the south side dial still at the lower level, although the west side is obscured by a tree it has the medieval window at that level so there could not have been a second, west-facing dial at that height in 1812 or indeed before.
1848: Mr. Peacock was paid £13/10/0d for repairing clock. The south clock chapter ring (the numerals) has the name ‘Peacock’ cast into it, whereas the western face casting has no name.  Therefore it is likely that the south dial was installed by Messrs. Peacock of St. Neots in 1848 and the west face in 1893.
1893: there is a rough note in the warden’s terrier notes that the clock was installed in 1893.  This could indicate when the clock and dial were raised up one level and west side face installed in addition to the south face.
1909: a photo of Buckden Church in the Country Life magazine of 31st July 1909, shows the dials painted white, not black.
1956, September:  The dials of the tower clock were repainted and the figures & divisions re-gilded with 23 carat gold leaf. Minor repairs were done to the clock. The work was carried out by Smith & Derby at a cost of £54. To meet this the Vicar held a Gift Day which produced over £93. The balance was created into a “Clock Fund” [now long gone].
1968 wardens’ notes: both clock faces need repainting and re-gilding; the west face’s hands were missing and it had been disconnected from the mechanism.

 

 

 

 

Image

800 to 10,000!

final total_Page_1

Now you see it, now you don’t!

The roof is fixed, the covers are off and the scaffolding has started to come down. Now that we are weather-proof, on we can move on to planning and fund-raising for the next big project. Thanks to all who have supported us so far with sponsorship, events, grants, donations – watch this space for more events and initiatives coming up in 2017!