Proposals for vestry-wall-railing repairs

Attachment A – Vestry external walls before stripping
Attachment D – Removed north boundary railings
Attachment E – Notes from site meeting on 10 May 19
Attachment F – Site Plan – Existing
Attachment G – Location Plan – Existing
Attachment H – Ground Floor Plan – Existing
Attachment I – Roof Plan – Existing
Attachment J – Ground Floor Plan – Proposed
Attachment K – Roof Plan – Proposed
Attachment L – Elevations – Proposed (Sheet 1)
Attachment M – Elevations – Proposed (Sheet 2)
Attachment N – Sections – Proposed – (Sheet 1)
Attachment O – Schedule of Works – Vestry Repairs – DRAFT
STATEMENTS of SIGNIFICANCE AND NEED

Attachment B & C Stripped vestry wall – see below

Vestry existing views 1 – 6 below